  • More hard evidence that Bellway homes pre-proposals will put additional pressure on local highways infrastructure, and will not be in the best interest of highway safety. “Visibility slay”

    By pmadmin
    In Bellway Homes
    Aug 25th, 2017
    0 Comments
    408 Views

    The visibility at the junction of Woodward Court, and Wellhouse Lane is not adequate to serve the additional traffic generated by the pre-proposed development, and the increased use of this junction will be hazardous. The pre-proposals will put additional pressure on local highways infrastructure, and will not be in the best interest of highway safety.

    Woodward Court is a short cul de sac which gives access to 12 existing properties on to Well house lane. Woodward Court is 6 metres wide with standard footpaths on both sides. According to highways specification (PPG13) the required visibility spay is 4.5 x 70m the visibility slay at present at Woodward Court is 4.5 x 22m

    Visibility at woodward court mirfield wm

     

    Available visibility at woodward court mirfield wm

     

     

    Regards

    S Benson

     